Teach you to supervise the construction team's 8 steps of construction of solid wood flooring

The wooden floor must be removed before being laid and then dried in a ventilated environment. At least one week, this is to adapt the wooden floor to the microclimate from the factory to the renovation site.

Then, the construction team should proceed as follows:

1. Clean the ground first.

2. Make sure the ground is dry.

3. Make a layer of asphalt oil. There is asphalt oil sold in the market, no need to use asphalt blocks to melt. The reason for this is to prevent moisture and insects.

4, hit the bottom plate: generally use 9 PCT splint, and some people use 12 PCT. The 9 PCT plate must be cut into four pieces with a gap of one centimeter between each piece. The steel plate is then used to secure the board to the ground.

5. Laying the logs. Use nails to hit the four sides of the board. Note that only two small points of white latex can be used per board. Because white latex is water-based, too much will cause the board to get wet and arch.

6. Polish the floor. At least three times. The second or more polished wood chips should be preserved.

7. Fill the gap between the boards with the retained sawdust powder.

8, on the wood floor oil. At least three times.

Our Pet Grooming Tables are guaranteed to have a sturdy platform, and allows for an easy and smooth adjustments to the height of the platform. This makes grooming more comfortable for pets, and allows for better access and ease of use for the vets. 

Pet Grooming Tables

Grooming Table,Dog Grooming Table,Cat Grooming Table,Universal Dog Grooming Table

Kimya Beauty Salon Manufacturer , https://www.jmkimya.com

Posted on